(Developed @ copyright: Dr Annamdas Venu Gopal Madhav & Annamdas Shantanu Vasudev Krishna)

Gopalkrishna Advanced Rural Research Foundation (GARRF)

Electromechanical Impedance (EMI) â€ĸ Dual Transducer Array â€ĸ ARJUN AI
FREE EDUCATION
Real-Time Laboratory Mode: Selecting an execution duration (1 to 5 minutes) locks simulator inputs during sweep execution. Once complete, spectrum download is enabled.
📌 Conceptual Study Disclaimer: The generated admittance signatures ($G$ and $B$) are modeled strictly for educational and conceptual analysis and do not represent exact field/site measurements.

Part 1 — Structure & Flexible PZT Transducers

Structure Length ($L$) 10.0 m
PZT 1 Start Offset ($x_1$) 0.5 m
PZT Inter-Spacing ($d$) [Min: 0.3m] 1.8 m
âš ī¸ Warning: Selected spacing or count places PZTs beyond length ($L$) or violates $0.3\text{m}$ clearance.

Part 2 — Experiment Execution & Sweep Time

Part 3 — Damage & Severity

Damage Severity Level 0% (None)

Part 4 — 3D Structural Context & Layout

● SYSTEM READY
âœˆī¸ 3D MODEL: WING BOX MAIN SPAR
PZT ARRAY LAYOUT (SPAN: 10.0m)

Part 5 — Bounded EMI Spectrum: Conductance ($G$) & Susceptance ($B$)

ELECTROMECHANICAL ADMITTANCE SIGNATURE
âŗ SWEEPING: 00:00
Conductance G(f)
Susceptance B(f) [Anti-Resonances]
Active Drive Transducer

Part 6 — EMI Signal Metrics

Peak Conductance (G) 0.00 mS
Susceptance Peak (B) 0.00 mS
RMSD Index 0.00 %
MAPE Metric 0.00 %

Part 7 — ARJUN AI Diagnosis

Awaiting EMI frequency sweep run. Select execution time and click Start.

Live Experiment Log

[00:00] EMI Aerospace SHM Simulator Initialized.
[00:00] Real-time timed execution mode active.
[00:00] Cumulative admittance B(ω) array model ready.